Customer Spotlight – Brooke Seckel

Brooke Seckel-01Brooke Seckel-02 Brooke Seckel-03

Brooke Seckel sent us a whole powerpoint of photos for this contest! The Seckels renovated nearly every part of their 1972 Lyman Islander; starting from the inside out. They repainted the entire 32-foot hull; using TotalBoat Wet Edge for topside paint and JD Select Bottom Paint for below the waterline, and replaced the entire top deck as well. In addition, they also replaced and varnished their Lyman mahogany helm (not shown). Both the interior and exterior of the boat’s cabin was redone; as well as the boat’s transom. This included an enormous amount of new brightwork and varnish, as well as replacing rotted wood in the window frames and in other areas. The Seckel’s dog also helped too! During the renovation process, you could almost always find Zephyr hanging around the shop and supervising everyone’s work. Unfortunately, we couldn’t use all of their fantastic photos here, but we’ve tried to highlight some of the most drastic changes, and we couldn’t resist leaving Zephyr out of the photos.

Leave a Reply